The Coronation Eco Station is now closed (starting March 31) while the facility is being upgraded. The facility is expected to re-open in spring of 2027.
According to the City of Edmonton, planned upgrades include:
- restructuring traffic flow and site layout;
- rehabilitating and expanding the existing Eco Station building with mechanical, electrical and structural upgrades;
- repurposing two existing garages to improve waste sorting;
- increasing the number of waste drop-off bins;
- installing solar photovoltaic and energy-efficient systems; and
- converting the decommissioned rail line at 143 Street and 115 Avenue into an access lane for drop-off bin service trucks.
Residents can alternatively drop off waste at Ambleside, Kennedale and Strathcona Eco Stations during the closure.

